It would be very useful if, in the new timesheet (in v 3.0 and 4.0), the estimated and loaded hours appear for each task in the rows of the table, with and without accumulating the downstream subtasks. This information would be very useful as a reference, so that each worker would have in view the hours assigned to do their tasks, without having to go looking for this information elsewhere. The timesheet is for daily use, it's an ideal place for this.