Completely new to ClickUp. Also the first time I use an online platform. I'm used to make (relatively simple) projects with the use of spreadsheets, mindmaps etc.
Standard procedure for me:
Make a WBS up to task level (usuallly 3-4 levels in total) in a spreadsheet. Assign the required time to each task. This gives an idea of the total time required for the project. From there: simple, Gantt-like structures.
My questions:
• Is there a way to make a WBS in ClickUp where I can see a WBS-like (or Gantt-like) structure?
• Is there a way to see the total time required for the project?
BTW, I'm absolutely open to new ways of working/viewing.
Thanks!