Timesheet widget should include rolled-up nested Subtasks tracked time (as an option)

Guy Mannerings
The Timesheet widget on Dashboards currently has no option to include rolled-up Subtasks tracked time.
I.e., If you have a filter set that would catch the Parent Task, but the time tracked was actually on the Subtask (which would NOT catch the filter), there should still be an option to include the time rolled up from that Subtask.
This is especially true if you have the "Time Tracking Rollup" ClickApp set.
E.g.:-
> I have the Timesheet widget with a Filter set for Tasks containing Custom Field 1 with Time Tracked.
> I have a Parent Task that has that Custom Field.
> That has a Subtask that does NOT have that Custom Field.
> I track time on the Subtask.
> In Task View, the Parent Task says the time was tracked (from being rolled up from the Subtask), but this Parent Task does not show in the Timesheet widget.