Description:
I link my Planner Events to specific ClickUp Tasks. It would be a massive productivity boost if the time duration defined in the Planner could be automatically (or with one click) synced to the "Track Time" section of the linked task.
The Problem:
Right now, even though I have a 2-hour block clearly marked in the Planner, I still have to manually type "2h" into the Time Tracker of the task once I’m done. This is redundant manual entry.
Requested Feature:
A button or setting to "Log this Event duration as Tracked Time" for the assigned task.
Seamless integration between the scheduled time in Planner and the actual time tracking logs.