Could you create a way to show the remaining time left in a job?
With a set Time estimate the stopwatch feature tracks your time input but does not deduct your tracked time from the overall time
estimate set. Seeing the remaining time left on a job would be awesome. As well as it allows you to collect accurate data for active
department man power hours.
It would also be nice if there was a way to notify personnel when the stopwatch time exceeds the overall time estimate. That way team
members can stay on top of tasks exceeding their identified set time estimates.
Also, the time estimate should be able to be plugged into the start and stop dates. Or work hand-in-hand with the Start and stop dates.
Meaning when a task/subtask has a Time estimate set, to utilize that time estimate information to range out that task/subtasks start and completion dates by the set time estimate.