Split tasks - multiple task schedules / allocations on the timeline
building now
Gamba (BW)
It's very common that some tasks may take a long time to complete, and in that period they might be interrupted or paused by some circumstance, and resumed later.
Right now, there isn't a comfortable way to visualize this, because having the task split in two or more separate tasks might lead to redundancy in it's descriptions, checklists, etc.
Having an insanely long task all over a Gantt diagram isn't optimal either, specially when it was really worked on 50% of it's declared time.
Log In
Vasil Enchev
Quick update on splitting
Still
Building now
, and moving properly. The shape of it, so nobody has to guess:One task, several separate work periods. Each part has its own dates and its own hours per day, with real gaps between them: two weeks on, a week off, finish later. It stays one task, so no cloned duplicates and no dummy dependencies to fake a pause.
In the beta you create the parts by cutting the bar on the timeline. Doing it from inside the task comes at 1.0.
What it will not do is pick the hours of your day (9 to 11 rather than "3 hours Tuesday"). That is time blocking, arriving with the next version of Planner.
Timing: weeks rather than months, corner cases are what is left. Signup form is in the pinned update above 🧪
Reed Holland
Any updates here? This would be very helpful!
Vasil Enchev
Still moving, and it is weeks rather than months. What is left is corner cases rather than the core interaction, and the beta opens once those close 👍
The beta signup form is linked in the pinned update further up this thread if you want to be on the list.
Vasil Enchev
Merged in a post:
Split tasks in workload
A
Amélie Bissonnette-Montminy
Like in "ForeCast", I would like to be able to split tasks in the workload view, so that a task that aren't ongoing will be split more accurately on the timeline.
Vasil Enchev
updated the status to
building now
Switching from beta to building now because we are postponing the beta with a few weeks. Still this is a top priority and we'll bring it very soon! Stay tuned.
Kim Hoang (BF)
When working on this request, please include the other request here as well as they are very related with each other. https://clickup.canny.io/feature-requests/p/work-scheduling-with-timeslots-intervals-for-all-day-tasks
Vasil Enchev
They are close, and I want to be straight about the difference. Splitting works in whole days: one task gets several parts, each with its own dates and its own hours per day. Picking the hours of the day you work on something is a different piece of work, and it is coming too, as time blocking in the next version of Planner.
Which of the two is actually blocking you: the gaps between the work periods, or the time of day?
Kim Hoang (BF)
Thanks for opening up this discussion! To answer your question directly: Both are actually blocking me, because real-world work happens in layers from multi-day workload planning down to splitting hours within a single day.
Here is a concrete example of how a real workflow requires both:
Scenario: Writing a 6-Hour Technical Report
1. Macro Level: Multi-Day Task Splitting (Timeline/Gantt)
The task takes 6 hours total, but it spans across a week with a gap:
- Monday: 2 hours (Pulling raw data)
- Tuesday & Wednesday: GAP (Waiting for external review)
- Thursday: 4 hours (Writing the final draft)
Why Task Splitting is needed: I cannot schedule this as a continuous Monday–Thursday task without destroying my capacity planning and creating false multi-day banners across the Gantt chart.
2. Micro Level: Intra-Day Time Blocking (Daily Calendar)
On Thursday, I have 4 hours allocated, but I cannot do 4 continuous hours due to meetings and personal schedule.
To solve this, I need to drag or create multiple time blocks directly on the calendar grid that link back to the parent task:
- Thursday Block 1 (Dragged on Calendar): 2:00 PM – 4:00 PM (2 hours) > Links to Parent Task
- Thursday Break / Meetings: 4:00 PM – 8:00 PM (Open slot on calendar)Thursday Block 2 (Dragged on Calendar): 8:00 PM – 10:00 PM (2 hours) > Links to Parent Task
Why Time Blocking is needed: On Thursday, I need to drag those two separate time blocks onto my schedule so colleagues don't book over my focus time-all while keeping them tied directly to the same parent task without forcing me to create bloated subtasks.
Summary
- Task Splitting distributes total effort across separate days (Macro).
- Time Blocking lets us split a day's effort into discrete calendar slots (Micro).
Without both, we are forced to either spam our workspace with endless micro-subtasks or manually manage external calendar blocks outside of ClickUp. Unifying these two concepts would be a massive differentiator!
Liam
Hi Vasil Enchev, I'm all signed up to this one as well. Can't wait!
Vasil Enchev
updated the status to
beta
Fellow ClickUppers, I have exciting news to share with you!
We’re getting ready to beta test this feature
Multi-Interval Task Scheduling
— split one task into multiple time blocks
(each with its own start/end) so work that starts, pauses, and resumes stays in one
task. No extra subtasks, better capacity signals.Photo Viewer
View photos in a modal
T
Tim Facemyer
Vasil Enchev YES!!!
J
James Gardener
Hi Vasil Enchev - any update on the progress of this one, please?
Vasil Enchev
James Gardener: few more weeks 4-6 and we'll have the beta ready, we have paused the development until work by day (unequal time distribution) is shipped. Then the work will resume.
T
Thomas
Hey Vasil Enchev Do you have any news regarding this feature?
Vasil Enchev
Thomas: yes, actual news, we've just resumed development on this alongside rolling out the new Work by Day feature. No firm date yet, but it's moving again. I'll post here as it gets closer. 👍
Rachel Meier
I'm looking forward to this update! My team would use this in the calendar view the most. They want to be able to time block out their projects that have multiple steps, so they can see that they need to work on it on Monday, follow up with some items on Wednesday, and wrap it up the following Monday. Having the ability to place a task on multiple days would create some ease and more accuracy with capacity planning.
L
Lorna Boyd
We hugely need this feature as a priority. We have a very start/stop industry so need to easily reflect the gaps that could be filled with other tasks
Vasil Enchev
updated the status to
planned
Exited to move this to planned as it will allow a lot of new workflows for ClickUp and true resource management.