4
Sprint point rollup not counting towards workload
in progress
Leo van Beek
In the Box view of a Sprint, tasks that are dependent on its subtasks' sprint point rollup aren't being added to the workload.
i.e. I have a task with 5 subtasks of 2 points each. The parent task does not have any sprint points set.
Issue #1 It complains there is a task without sprint points, while the rollup shows it being 10.
Issue #2 Those 10 points are not being added to the total workload.
Expected behaviour: when enabling the rollup feature, tasks will always inherit the sum of its subtasks' points as a base amount. Any points added to the parent task will be extra.
Log In
Activity
Newest
Oldest
M
Michael Van Doorn
in progress
M
Michael Van Doorn
under review
Hey, there!
We have confirmed issue #1 and have passed the details to our Engineering team.
Regarding issue #2, are you still seeing this problem? If so can you provide screenshots or further details?
We'll be on the lookout for your response!
Leo van Beek
@Michael Van Doorn: I had stopped using the Box view because of this bug, but I've just re-added it and am still seeing the same issue when the view setting for subtasks is 'Collapse all'. It does seem to work now when set to 'As separate tasks'.
To reproduce:
- Assign someone a single task with 2 subtasks
- Add 3SP to both subtasks and let the rollup define the total SP for the parent task as 6 (so parent task has no SP of its own)
- In Box view, set Workload to sprint points
- Assignee's Box shows 0 for 'not done' and 0 for 'done', even though there's a task to do with 6SP.
For now I guess I'll set subtask view to 'As separate tasks', even though that triggers a bunch of unscored tasks warnings elsewhere. Can we get best of both worlds? :)
Thanks!

M
Michael Van Doorn
@Leo van Beek: Thank you for those in-depth details!
I have confirmed this issue and passed these details to our team! We'll be sure to reach out as soon as we have any updates!