In the Box view of a Sprint, tasks that are dependent on its subtasks' sprint point rollup aren't being added to the workload.
i.e. I have a task with 5 subtasks of 2 points each. The parent task does not have any sprint points set.
Issue #1 It complains there is a task without sprint points, while the rollup shows it being 10.
Issue #2 Those 10 points are not being added to the total workload.
Expected behaviour: when enabling the rollup feature, tasks will always inherit the sum of its subtasks' points as a base amount. Any points added to the parent task will be extra.